top of page

Vesta Technology 

Temporary Industrial Enclosure

  • A temporary Airwise Structure was installed for waste storage and processing at an industrial site. The enclosure provided environmental protection while allowing normal site operations to continue.

  • During its service life, the structure survived a hurricane without interruption to operations or structural failure.

  • This project demonstrated system resilience and reliability under extreme weather conditions.

Technical and project documentation for this case study are available through the Resource Library.

Airwise-Structures-waste-recovery-recycling-processing
bottom of page