top of page

Vesta Technology
Temporary Industrial Enclosure
-
A temporary Airwise Structure was installed for waste storage and processing at an industrial site. The enclosure provided environmental protection while allowing normal site operations to continue.
-
During its service life, the structure survived a hurricane without interruption to operations or structural failure.
-
This project demonstrated system resilience and reliability under extreme weather conditions.
Technical and project documentation for this case study are available through the Resource Library.

bottom of page