top of page
Large Remediation Site Cover-650 x 250

Chemical Waste Management  Accelerated Remediation

 

Controlled Climate
  • A large Airwise Structure was erected over a lined pit used for the recovery and processing of contaminated soil. The enclosure provided consistent temperature and moisture conditions critical to chemical and biological remediation processes.


No Airlocks Required
  • Large vehicle access doors were incorporated without airlocks, using controlled airflow to maintain inflation during active operations. The structure enabled uninterrupted processing regardless of weather.


Time & Money Saved
  • After installation, remediation progressed faster than anticipated, allowing the project to meet contractual requirements with a single enclosure, resulting in significant cost savings.

Technical and project documentation for this case study are available through the Resource Library.
Waste Management-site remediation
truch exiting large equipment door-no airlock
bottom of page