top of page


Chemical Waste Management Accelerated Remediation
Controlled Climate
-
A large Airwise Structure was erected over a lined pit used for the recovery and processing of contaminated soil. The enclosure provided consistent temperature and moisture conditions critical to chemical and biological remediation processes.
No Airlocks Required
-
Large vehicle access doors were incorporated without airlocks, using controlled airflow to maintain inflation during active operations. The structure enabled uninterrupted processing regardless of weather.
Time & Money Saved
-
After installation, remediation progressed faster than anticipated, allowing the project to meet contractual requirements with a single enclosure, resulting in significant cost savings.
Technical and project documentation for this case study are available through the Resource Library.


bottom of page