top of page

CONSTRUCTION

 
Build Without Weather Delays
  • Airwise Structures provide immediate enclosure over active construction sites, allowing work to continue regardless of rain, snow, wind, or temperature extremes.

Weather Protection Without Permanent Buildings
  • Temporary enclosures eliminate weather-related delays.

Rapid Deployment Over Complex Sites
  • Structures can be designed to fit around fixed equipment, conveyors, and partially completed works.

Large Clear Spans
  • Unrestricted movement of equipment and personnel improves safety and efficiency.

Operational Flexibility
  • Large vehicle and equipment access is possible without airlocks.

  • Airwise Structures have supported construction activity in extreme climates, including temperatures as low as −65°F (−54°C).

 
 
Cover the site for Safety and Security
  • These three historical photos show a weather compromised construction site in New Jersey, before and after the installation of an Airwise construction cover.

 
Detailed construction case documentation is available through the Resource Library.

Pre-Airwise Site: No Protection

Construction-uncovered-foster

Airwise Cover Installed

Construction-cover-installed

Same Site Undercover

Construction-inside-foster-dry
bottom of page