top of page

X-Files Production Domes

Film Industry Application

  • Two identical Airwise predecessor structures were designed and installed for major motion picture production. The domes provided controlled environments for specialized filming requirements.

  •  

  • Both structures were deployed rapidly and fully installed within a tight production schedule. Their large clear spans and adaptability supported complex set construction.

  •  

  • This project illustrates the flexibility and speed of deployment achievable with Airwise technology.

Technical and project documentation for this case study are available through the Resource Library.
side x side Airwise Structures
Airwise Structure-end with door
bottom of page